Adamo performed the Farmington Hills DPS Water Supply System Improvements, Water Storage Tank Site Work.
The project involved removing and installing new approaches; repairing a portion of Halsted Road; installing new site storm drainage, new drive and parking lot paving on the site; and construction of a storage structure and entry/exit gates with security card reader systems.