St. Joseph Mercy Hospital – Pontiac Post – Tensioned Parking Deck Demolition
Adamo demolished the 6-level, post-tensioned, parking deck adjacent to the Pontiac St. Joseph Mercy Hospital. This project was complicated by a single story chapel directly adjacent to the demolition and within inches of the exterior parking deck stairwell being demolished. The stairwell was meticulously dismantled and removed by crane to avoid any damage to the chapel.
Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.